Projects Handling in SAP IDT

Last updated on Sep 24 2022
Sankar Rao

Table of Contents

Projects Handling in SAP IDT

To design a Universe in IDT, the first step is to create a project in Local Project views. All the resources like Data Foundation and Business layers are managed in a project. You can navigate to local projects and access the resources in the local project using Information Design Tool (IDT).

Once you create a Local Project, resources can be populated under it in different ways −

  • You can create new resources using “New” option.
  • Convert .unv Universe created from Universe Design Tool.
  • Retrieve a published Universe.
  • To edit a resource, you can double-click on a resource under Local Project.
  • sap 83

Checking Existing Projects in IDT

You can open an existing project in IDT. Go to File → Open Project.

sap 84

A new window will open. You can select from the root directory or from archive file to import an existing project.

To import from the root directory, click on Browse, select the Project you want to import and click OK.

sap 85

Creating a New Local Project in IDT

To create a new project in IDT, go to File → New → Project.

sap 86

Enter Project Name, location and click Finish.

sap 87

The project is created under Local Projects views.

Editing an Existing Project

You can also edit an existing project. Open an existing project by going to File → Open Project. You can also open an existing Universe under any Local Project area.

Once you open an existing project, you can go to each object by double clicking the object name under Local Project folder.

sap 88

Make changes as required and click the Save button.

Deleting a Project in IDT

To delete an existing project, right-click on the project under Local Project area.

sap 89

To delete a project permanently, you can select “Delete project contents on disk option” in the “Confirm Project Delete” dialog box.

If you select this option, the deletion is permanent and cannot be undone. Click on “Yes” to confirm the deletion.

If you did not delete the project contents permanently, you can open the project to make it available.

Project Synchronization

Project synchronization deals with comparing resources in local project views with an associated shared project in the repository. Using project synchronization, you can detect add/delete resources, difference between resources. Based on differences, the local project view and shared resources can be updated.

Under Project synchronization, there are two different panes −

Shared Project Pane

It lists the resources in shared project on the server. If there is a lock icon in the form of resource, it means the resource is locked. Synchronization status lists the status of each resource by comparing resources in shared and local project views.

Different Synchronization Status

Added Locally − A resource is added in the local project but not in the shared project.

Changed Locally − A resource was changed in the local project but not in the shared project.

Deleted Locally − A resource was deleted in the local project but still exists in the shared project.

Added on server − A resource is not in the local project but exists in the shared project.

Changed on server − A resource was changed in the shared project but not in the local project.

Deleted on server − resource exists in the local project but was deleted in the shared project.

Synchronize − Both resources are identical.

List of Resources in Synchronization Status Pane

Shows all resources. This clears the filters and lists all resources regardless of their status.
Shows/Hides the resources with a status Synchronized
Shows/Hides the resources in the local project that have changed with respect to the server.
Shows/Hides the resources with a status of Conflicting.
Shows/Hides the resources on the server that have changed with respect to the local project

How to Perform Project Synchronization?

To perform Project Synchronization, go to Windows → Project Synchronization.

sap 90

Click ‘Change session’ to open a session on the repository system where the shared projects are saved.

sap 91

Select a project to synchronize in the shared project list.

sap 92

Locking a Resource

To lock a resource in Project Synchronization, it should be under shared project. Lock informs other developers that you are working on the resource.

To lock a resource − Select the shared project from shared project list. Expand the project. Select the resource → Right click → Click Lock.

sap 93

Unlocking a Resource

To unlock a resource, select the resource under Project Synchronization. Right click → Unlock.

sap 94

Saving Resources in IDT

It is also possible to save any resource in a local project as a report in the local file. To save a resource, right-click on any resource, Save As.

sap 95

In the Report Location box, enter a file path, file name, and file type for the report. The file type can be .pdf, .html, or .txt.

sap 96

To browse the local file system to find a file path, click the browse button.

For larger resources (data foundations and business layers), you can select which metadata elements to include in the report in the Metadata Elements box.

Click Generate to create the report.

So, this brings us to the end of blog. This Tecklearn ‘Projects Handling in SAP IDT’ blog helps you with commonly asked questions if you are looking out for a job in SAP Business Object and SAP Domain. If you wish to learn SAP IDT and UDT and build a career in SAP domain, then check out our interactive, SAP Business Objects Certification Training, that comes with 24*7 support to guide you throughout your learning period. Please find the link for course details:

https://www.tecklearn.com/course/sap-business-objects-certification-training/

SAP Business Objects Certification Training

About the Course

Business intelligence tools and features are used by multiple companies and firm for the effective results their large flow of data. The completion of this SAP Business Objects training will be helpful in landing yourself a good paying job. With this Business Objects online training, you will gain considerable proficiency in SAP BO architecture, data warehousing, use of Information design tool, create multiple reports and the implementation of Web intelligence and Efficiency in solving the issues of data sources and Crystal dashboard design.

Why Should you take SAP Business Objects Training?

  • The Average salary of SAP Business Objects Business Intelligence Analyst is $94,000 per annum – PayScale.com
  • Business Objects is an enterprise reporting tool and Scalability is one of the primary reasons large corporations choose Business Objects for their BI needs.
  • Worldwide Business Intelligence and Analytics Market to grow to $22.8 billion in next 2 years – Gartner.

What you will Learn in this Course?

Introduction to Business Objects

  • History and Version of Business Object
  • How Business Objects works in SAP family
  • SAP BO-Business Intelligence package and tool list
  • Data warehousing concept from SAP perspective

SAP Business Object Architecture

  • SAP BO Architecture
  • Various tiers in architecture: Client, Processing, Intelligence

SAP Web Intelligence

  • Web Intelligence Overview
  • Variable in Web Intelligence environment

Using Universe Designer Tools (UDT)

  • Overview of the Universe Designer Tool
  • Working with shared, secured and personal connections
  • Understanding of the Semantic layer

SAP BO Reports

  • SAP BO Reports
  • Chart Reports, Table Reports, Sorting and aggregating of Reports
  • Various elements of Reports, graphs, text elements
  • Reports and Filters
  • Section Report
  • Break Report
  • Alerts Report
  • Scope of Analysis Panel
  • Conditional Reporting
  • Ranked Report
  • Drill Report

Advanced Formatting

  • Advanced methods of formatting in SAP BO
  • Identifying Chasm trap and resolving Chasm traps with various methodologies
  • Detection and resolving of loop

Information Design Tool (IDT) Integration

  • Introduction to SAP BO information design tool
  • Extracting data from various sources using OLAP methodologies
  • Creating of Universe with IDT
  • IDT Vs UDT
  • Working with IDT as an Integration tool

Getting started with Crystal Dashboard

  • Data visualization tool for creating interactive dashboards
  • Point-and-click Features
  • Various dashboard features and interface

Live Office

  • Live office
  • Detailed design of Crystal Dashboard

SAP BO 4.2 Features

Got a question for us? Please mention it in the comments section and we will get back to you.

 

0 responses on "Projects Handling in SAP IDT"

Leave a Message

Your email address will not be published. Required fields are marked *